Tuesday, 31 December 2024
Let’s hit “PLAY” again!
Monday, 12 August 2024
...and, pause...
So that brings things up to date. As I update this (August 24) I am knee deep in building work on my new house and the Guzzi is waiting patiently in storage for me to get things to a decent stage so that I can finish her off.
Apart from finishing the paint and doing the electrics, it should be mostly an enjoyable assembly project now. Famous last words or what?! Anyway, hopefully we can have things completed in time for Spring 2025, just 12 months late!!
Repairing the Centre Stand
The "feet" of the centre stand had completely worn through with use and the mud etc that had then compacted in the open tubes was set like concrete! I managed to clear it all out and then cut back the thin, corroded tube further until I reached sound metal.
This repair was much more challenging than the frame repair, as the steel was relatively thin, but I got there in the end! Again, the sanding disc was used to grind the welds back and give an acceptable finish, especially as it will hardly be seen once on the bike.
Reinstating the frame rails
The previous owner hacked off the back 6" of the frame to make a "brat" look. Hmmm. I needed it reinstating to carry the rear mudguard and rack mounting points.
I'd got hold of an old frame and chopped off the missing parts. I found some steel tube and cut a couple of 3" long pieces to act as sleeves inside the frame to reinforce the joints.
I'd bought an old welder to try and use, but I just couldn't get it to weld consistently, so I bit the bullet and bought a new welder - talk about chalk and cheese! Within 15 minutes I was producing decently strong (but maybe not very pretty!) welds.
I mocked up the replacement frame horns, temporarily fitting the mudguard to get everything in the right place and then I clamped it all up, before putting a couple of tack welds in to hold it all together.
Painting the engine and transmission
I'm going for an all black look with this bike. The engine and shaft drive would have been silver originally but I reckon this will look good and it's my bike so that's how it's going to be!
The engine and shaft drive were both pretty filthy so I spent a couple of hours with degreaser and a wire brush getting it all ready for paint.
Painting the bodywork
I sent the petrol tank and rear mudguard off to a local sandblasters to have all the old paint and filler etc removed.
They turned out to be in remarkably good shape with just a small dent in the lower part of the tank to repair. I got a couple of coats of red lead primer on them to stop any rusting while they went back into storage for a while.
Before:
After blasting and priming:
All of the other body parts (side panels, front mudguard and an original fairing that I bought from Italy) are plastic. A month or so later, once there were some warm days, I got everything out again to get it all primed and with a couple of coats of the top coat on, just to protect it all till next winter.
I'm using Halfords Enamel paint again. It proved to be pretty durable on the Crusader rebuild and this bike is being restored to be used rather than being a show bike. I've chosen a bright metallic blue colour, which might be a bit TOO bright - we shall see. It can always be redone another time if I really don't like it. I warmed the paint up in a bowl of hot water as it was still coolish outside where I was painting.
Life gets in the way again!
I haven't updated this for about 8 months. Life has a habit of getting in the way of my plans and that has happened big style this year!
In February, I ended up flying solo in terms of relationship status and moved temporarily to stay with some friends on their field in my caravan. This compromised the restoration process somewhat!! They kindly made some space available for me in an old potting shed and so, once I'd settled in, all of the pieces of the Guzzi were reloaded into my car and moved to their new temporary home.
So I now had limited space to work, mostly this small shed and the caravan awning! Not ideal.
I had a couple of months "hiaitus" while waiting for the purchase of my new house to complete, and this will be a major project for the rest of the year, so I tried to get a few significant bits done before it all got laid up to be hopefully completed during Winter 2024/5.









